Article 2: Administration Section 2.5. Application-Specific Review Procedures 2.5.25. Wireless Telecommunication Facilities
(iv) Are consistent with the Major Site Plan Approval. Consistency means the changes would not significantly alter the developmentās general function, form, intensity, character, demand on public facilities, impact on adjacent properties, or other characteristic from that indicated by the Major Site Plan Approval. In any case, the following changes from the Major Site Plan Approval for Wireless Telecommunication Facilities shall constitute a major change requiring amendment of the Major Site Plan Approval in accordance with Section 2.4.8.D Modification or Amendment of Approval:
Wireless Telecommunication Facilities Requiring a Minor Site Plan
Step is Applicable
(B)
Step is Not Applicable
Pre-Application Conference
(i)
A change in a condition of approval.
Application Submittal and Acceptance
(ii) A change in the height of the facility.
(iii) A change in the size of the compound area.
Staff Review and Planning Director Decision with DRC review
Minor Site Plan Figure 2.5.25.C.3 and the following subsections identify those steps in the standard review procedure (see Section 2.4) applicable to the to the review of Wireless Telecommunication Facilities application requiring a Minor Site Plan, or additions to, those review steps.
Scheduling and Notice of Meetings
a. Pre-Application Conference
Planning and Zoning Board Review and Recommendation
The applicant shall hold a pre-application conference with Town staff in accordance with Section 2.4.2.
b. Application Submittal and Acceptance
Town Council Review and Decision
The application shall be submitted and accepted, and may be withdrawn, in accordance with Section 2.4.3.
Figure 2.5.25.C.3
Staff Review and Decision The Planning Director shall review the application, allow revisions of the application, and decide the application in accordance with Section 2.4.4 and Section 2.5.7.D. The decision shall be one of the following:
c.
(1) Approve the application as submitted;
(2) Approve the application subject to conditions; or
(3) Deny the application.
d. Post-Decision Actions
The post-decision actions and limitations in Section 2.4.8 shall apply to the application except as follows:
(1) Effect of Approval
Minor Site Plan Approval for Wireless Telecommunication Facilities allows the approval of any concurrently-reviewed applications for Construction Plan Approval, Floodplain Management Permit, Stormwater Management Permit, Administrative Adjustment, or Alternative Equivalent Compliance for the same development. It also authorizes submittal of any other development applications that may be required before construction or use of the development authorized by the Minor Site Plan Approval.