Morrisville Unified Development Ordinance - June 2017

Article 5: Development Standards Section 5.11. Utilities and Services 5.11.1. General

surrounding neighborhoods, maintaining traffic-circulation patterns, and promoting quality urban design as would strict compliance with the otherwise applicable off-street parking standards.

SECTION 5.11. UTILITIES AND SERVICES

5.11.1. General

A. Compliance with Provider Standards All utility lines and facilities—such as, but not limited to, those providing sewage disposal, drinking water, nonpotable reclaimed water, electric power, natural gas, telecommunication, or cable television service—shall be located, designed, and constructed or installed in accordance with the standards of the utility entity providing the utility service. General All utility lines and facilities shall be installed in such a manner and at such a time as to minimize interference with other utility lines and facilities, disruption of roadways or other infrastructure improvements, and disruption of vehicular or pedestrian traffic, and to facilitate maintenance of the utility lines and facilities without undue damage to infrastructure improvements. Underground Installation Required In all new development, electric distribution feeder lines and all other utility lines located on the development site and/or along the public right-of-way abutting the site shall be installed underground unless the Town Engineer waives this requirement in response to demonstration that undergrounding the line will be detrimental to the overall safety and/or reliability of the circuit or utility system. Development in the Historic Crossroads Village District that involves the adaptive reuse of an existing structure is exempt from this requirement. B. Installation A. Development with public sewer and potable and reclaimed water are conditioned on the availability of sufficient sewer or water capacity in the Town of Cary sewer and/or water systems to serve the proposed development. If sufficient sewer and/or water capacity for the proposed development is available, then sewer and/or water lines and facilities for the development shall be connected to the Town of Cary sewer and/or water system. Public sewer and/or water lines and facilities shall be constructed to the standards, sizes, and specifications of the Town of Cary, and dedicated to the Town of Cary for operation and maintenance. If sufficient sewer and/or water capacity for the proposed development is not available, then the developer may request Town approval of plans for the construction of alternative public sewer and/or water systems. Sewer and/or water lines for an alternative community sewer or water system shall be built to the standards, sizes, and specifications of the Town of Cary. B. Oversized sewer and/or water improvements shall be provided where required by the Town of Cary in accordance with its policies and regulations. C. The developer shall pay all water and sewer development fees to the Town of Cary before plat recordation or issuance of a Building Permit, whichever occurs first. D. For any development applications located outside of the Morrisville-Durham Water and Sewer Service Areas and Annexation Boundaries Agreement Area, upon Rezoning Approval (Section 2.5.3), Conceptual Master Plan Approval (Section 2.5.4), Special Use Permit (Section 2.5.5), Type 1 Subdivision (Ord. No. 2016-001, 05/10/2016) 5.11.2. Public Sewer and Water

June 23, 2017

Morrisville, NC

Page 5-120

Unified Development Ordinance

Made with FlippingBook - professional solution for displaying marketing and sales documents online