Morrisville Unified Development Ordinance - May 2020
Article 2: Administration Section 2.5. Application-Specific Review Procedures 2.5.9. Floodplain Development Permit
2. Complies with applicable standards in Article 5: Development Standards, Article 6: Riparian Buffers, Article 7: Stormwater Management, and Article 8: Performance and Maintenance; 3. Complies with all other applicable standards in this Ordinance; 4. Complies with the Engineering Design and Construction Manual; 5. Complies with all other applicable Town ordinances and state and federal laws; 6. Complies with all requirements and conditions of approval of any prior development permits or approvals.
Floodplain Development Permit
2.5.9.
A. Applicability
1. The procedure and standards in this subsection apply to the reviewof applications for a Floodplain Development Permit, which shall be required before commencement of any development activities within Floodplain Overlay (FO) districts. 2. An application for a Floodplain Development Permit may be submitted and reviewed concurrently with applications for Site Plan Approval, Construction Plan Approval, or Stormwater Management Permit, Administrative Adjustment, or Alternative Equivalent Compliance. B. Floodplain Development Permit Procedure
Floodplain Development Permit
Figure 2.5.9.B and the following subsections identify those steps in the standard review procedure (see Section 2.4) applicable to the review of a Floodplain Development Permit application and note any specific variations of, or additions to, those review steps. 1. Application Submittal and Acceptance The application shall be submitted and accepted, and may be withdrawn, in accordance with Section 2.4.3, except that the application shall include certificates of reference level elevations and any proposed floodproofing. (See Section 5.6, Floodplain Management.) 2. Staff Review and Decision The Town Engineer shall review the application, allow revisions of the application, and decide the application in accordance with Section 2.4.4. The decision shall be one of the following:
Step is Applicable
Step is Not Applicable
Pre-Application Conference
Application Submittal and Acceptance
Staff Review and Town Engineer Decision
Scheduling and Notice of Meeting
a. Approve the application as submitted;
b. Approve the application subject to conditions; or
c.
Deny the application.
Planning and Zoning Board Review and Recommendation
3.
Post-Decision Actions
The post-decision actions and limitations in Section 2.4.8 shall apply to the application except as follows: a. Effect of Approval A Floodplain Development Permit allows the approval of any concurrently-reviewed applications for Site Plan Approval,
Town Council Review and Decision
Figure 2.5.9.B
Construction Plan Approval, Stormwater Management Permit, Administrative Adjustment, or Alternative Equivalent Compliance for the same development. It also authorizes submittal of an
Morrisville, NC
May 26, 2020
Unified Development Ordinance
Page 2-54
Made with FlippingBook flipbook maker