Morrisville Unified Development Ordinance – September 2018
Article 2: Administration Section 2.5. Application-Specific Review Procedures 2.5.13. Building Permit
B. Sign Permit Procedure Figure 2.5.12.B and the following subsections identify those steps in the standard review procedure (see Section 2.4) applicable to the review of a Sign Permit application and note any specific variations of, or additions to, those review steps. Application Submittal and Acceptance The application shall be submitted and accepted, and may be withdrawn, in accordance with Section 2.4.3. Staff Review and Decision The Planning Director shall review the application, allow revisions of the application, and decide the application in accordance with Section 2.4.4. The decision shall be one of the following: a. Approve the application as submitted; b. Approve the application subject to conditions; or c. Deny the application. Post-Decision Actions The post-decision actions and limitations in Section 2.4.8 shall apply to the application except as follows: a. Effect of Approval
Sign Permit
Step is Applicable
Step is Not Applicable
Pre-Application Conference
Application Submittal and Acceptance
Staff Review and Planning Director Decision
Scheduling and Notice of Meeting
Planning and Zoning Board Review and Recommendation
Town Council Review and Decision
A Sign Permit authorizes submittal of an application for an Electrical Permit for approved signage involving electrical power, and the erection, installation, construction, alteration, or moving of approved signage. b. Expiration of Approval A Sign Permit shall expire if the approved signage is not erected, installed, constructed, altered, or moved within six months after the date of Sign Permit Approval. C. Sign Permit Review Standards An application for a Sign Permit shall be approved only if the Planning Director determines that the proposed sign complies with all applicable standards in Section 5.16, Signage. 2.5.13. Building Permit A. Building Permits are approved and issued by the Building Official in accordance with review procedures and construction standards in the State Building Code. A Building Permit is required before construction, erection, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal, or demolition of any building or structure. It certifies that plans for such activity demonstrate compliance with the construction standards in the Building Code. B. No Building Permit shall be issued for a structure unless it is in accordance with all prior approvals. 2.5.14. Certificate of Compliance/Occupancy A. Certificates of Compliance/Occupancy are approved and issued by the Building Official in accordance with review procedures and standards in the State Building Code. A Certificate of Compliance/Occupancy is required before a structure being developed in accordance with a Building Figure 2.5.12.B
September 25, 2018
Morrisville, NC
Page 2-54
Unified Development Ordinance
Made with FlippingBook - Online Brochure Maker