Transportation Plan - 2009, amended

Town of Morrisville 2009 Transportation Plan Addendum (February 2012)

Date

Page Description of Revision 24 (Map) Change color on Future Roadways map from hatched navy blue (New Four-Lane Boulevard) to hatched green (New Two-Lane Blvd.) for Carrington Mill Blvd. Extension from the roundabout to Slater Road. E-2 Add “Phase 1” to Carrington Mill Blvd. Extension Update “location” for Carrington Mill Blvd. Extension Ph. 1 to indicate the terminus as the roundabout at Lot 5. Add a new block with Carrington Mill Blvd. Extension Ph. 2 with “location” as roundabout to Slater Road, “Future Roadway Type” as Two-Lane Boulevard and “Future ROW (feet)” as 75 Add “Carrington Mill Extension Ph. 2” to the Two-Lane Boulevard inventory Delete first bullet under Four-Lane Boulevard and add “Carrington Mill Blvd. and Carrington Mill Blvd. Extension Ph. 1” E-4

Made with FlippingBook - Online catalogs