Transportation Plan - 2009, amended
Page 4
Proposed Future Cross-Section for Evans Road
1. A 10-foot multi-use path, as shown in this cross-section, would not apply to the portion of Evans Road where the proposed Crabtree Creek Greenway diverges from the right-of-way. 2. 124 feet referenced above includes 4.5 feet of right of way outside of each multi-use path
kimley-horn.com 3001 Weston Parkway, Cary, NC 27513
919 677 2000
Made with FlippingBook - Online catalogs