Updated Working DRAFT UDO_Adopted Version_July 2024

Article 5: Development Standards Section 5.6. Floodplain Management 5.6.1. Purpose

greenway, or other open space area identified in parks and recreation plans or other plans adopted by the Town; b. The extent to which the size, shape, topography, geology, soils, and public accessibility of the development site makes it impractical to provide required public recreation area that complies with Section 5.5.2.D, Design Standards for Required Public Recreation Area. c. Whether the in-lieu payment option provides the additional design flexibility needed to accommodate allowable higher-intensity development in the Transit-Oriented Development (TOD) District, or allowable higher-intensity development on substantially constrained sites elsewhere in the town; and d. Whether the Town’s use of an in -lieu payment to help acquire and develop parks, greenways, and other open space areas would better meet the open space and recreational needs of occupants and users of the development than on-site provision, or any proposed off-site provision, of the required public recreation area. (Ord. No. 2014-051, 11/10/2014; Ord. No. 2015-047, 07/28/2015; Ord. No. 2015-066, 07/28/2015; Ord. No. 2016-001, 05/10/2016) The purpose of this section is to set forth methods and provisions for minimizing the risks of flooding and flood damage in the Floodplain Overlay (FO) District. Specifically the standards in this section are intended to: A. Restrict or prohibit development that is dangerous to health, safety, and property due to water or erosion hazards, or that result in damaging increases in erosion or in flood heights or velocities; B. Require development vulnerable to floods, including facilities serving such development, to be protected against flood damage at the time of initial construction; C. Control the alteration of natural floodplains, stream channels, and natural protective barriers, which help accommodate or channel floodwaters; D. Control filling, grading, dredging, and other development that may increase flood damage; and E. Prevent or regulate the construction of flood barriers that will unnaturally divert floodwaters or which may increase flood hazards in other areas. 1. An Elevation Certificate (FEMA Form 81-31) is required before the actual start of any new construction. It shall be the duty of the applicant for a Floodplain Development Permit to submit to the Town Engineer a certification of the elevation of the reference level, in relation to mean sea level. The Town Engineer shall review the certificate data submitted. The permit holder shall correct deficiencies detected by such review before the application for a Floodplain Development Permit may be approved. Failure to submit the certification or make required corrections of it shall be cause to deny a Floodplain Development Permit. 2. An Elevation Certificate (FEMA Form 81-31) is required after the reference level is established. Within seven calendar days after establishment of the reference level elevation, it shall be the duty of the holder of a Floodplain Development Permit to submit to the Town Engineer a certification of the elevation of the reference level, in relation to mean sea level. Any work done within the seven day calendar period and before submittal of the certification shall be at the permit holder’s risk. The Town Engineer shall review the certificate data submitted. The permit holder shall correct SECTION 5.6. FLOODPLAIN MANAGEMENT 5.6.1. Purpose 5.6.2. Required Certificates A. Elevation Certificates

Morrisville, NC

July 1, 2024 Page 5-20

Unified Development Ordinance

Made with FlippingBook - Online Brochure Maker