Morrisville Administrative Manual_April 2023

Part 1. Introduction6
1.1. Purpose6
1.2. For Help in Using this Manual6
1.3. Development Review Process Chart6
Part 2. Application Review Procedures9
2.1. Introduction9
2.2. Standard Review Procedures9
2.2.1. Pre-Application Conference9
2.2.2. Application Submittal and Acceptance9
2.2.3. Staff Review and Action10
2.2.4. Public Meeting Notice10
2.2.5. Planning and Zoning Board Review and Recommendation10
2.2.6. Planning and Zoning Board or Town Council Review and Decision11
2.2.7. Post-Decision Actions11
2.3. Common Application Procedures11
2.3.1. Site Plan Approval12
2.3.2. Subdivision Approval12
A. Preliminary Plat Approval12
B. Final Plat Approval12
C. Determination of Subdivision Exclusion12
2.3.3. Construction Plan Approval / Stormwater Management Permit13
2.3.4. Payment in Lieu of Public Improvements, Performance Guarantees, and Maintenance Guarantees13
A. Payment in Lieu of Construction of Public Street Improvements13
B. Performance Guarantees13
C. Maintenance Guarantees14
2.3.5. Pre-Construction Conference, Notice, and Report14
A. Pre-Construction Conference14
B. Pre-Construction Notice14
C. Pre-Construction Report14
2.3.6. Building Permit15
2.3.7. Inspections during Development15
2.3.8. Stormwater Final Inspection and As-Built Plans16
2.3.9. Certificate of Compliance/Occupancy16
2.3.10. Sign Permit16
2.4. Additional Application Procedures16
2.4.1. Annexation16
A. General16
B. Voluntary Annexation Procedure17
2.4.2. Bulletin Drawing17
A. General17
B. Bulletin Drawing Approval Procedure17
2.4.3. Comprehensive Plan Amendment18
A. General18
B. Comprehensive Plan Amendment Review Procedure18
2.4.4. Conceptual Master Plan Approval19
2.4.5. Floodplain Development Permit20
2.4.6. Food Truck Permit20
2.4.7. Grave Removal20
A. General20
B. Grave Removal Approval Procedure20
2.4.8. Interpretation21
2.4.9. Plot Plan21
2.4.10. Retaining Wall21
A. General21
B. Retaining Wall Review Procedure22
1. Design and Submittal Requirements22
2. Construction Requirements22
3. Post Construction22
2.4.11. Right-of-Way Encroachment Agreement22
2.4.12. Riparian Buffer Development Review23
2.4.13. Road Closure23
A. General23
B. Road Closure Procedure23
2.4.14. Road Renaming24
A. General24
B. Road Renaming Procedure24
2.4.15. Site-Specific Development Plan Designation24
2.4.16. Special Event Permit24
2.4.17. Special Use Permit25
2.4.18. Telecommunications Facility Approvals25
2.4.19. Unified Development Ordinance Amendments25
A. Rezoning (Map Amendment)25
B. Text Amendment26
2.4.20. Zoning Compliance Letter26
2.4.21. TRANSPORTATION IMPACT ANALYSIS27
A. General27
B. Review Procedures27
2.5. Procedures for Flexibility, Variances, and Appeals27
2.5.1. Administrative Adjustment27
2.5.2. Administrative Appeal28
2.5.3. Alternative Equivalent Compliance28
2.5.4. Alternative Standards29
2.5.5. Development Agreement29
2.5.6. Variance29
A. General Variance Review Procedure29
B. Riparian Buffer Variance Review Procedure30
C. Stormwater Variance Review Procedure30
Part 3. Outside Agency Permits and Approvals31
3.1. Local Agency and Utility Approvals31
3.1.1. Wake County Erosion and Sedimentation Control Regulations31
3.1.2. Wake County Road Name Approvals31
3.1.3. Town of Cary Water and Sewer Approvals31
3.1.4. Other Utilities31
A. Duke Energy31
B. PSNC Energy31
C. Telecommunication Services31
3.2. State Agency Permits and Approvals32
3.2.1. NCDOT Driveway Permits, Right-of-Way Encroachment Agreements, Street Design32
3.2.2. North Carolina Department of Environmental Quality Permits and Approvals32
3.3. Raleigh-Durham International Airport34
3.3.1. RDU Sample Avigation Easement34
Part 4. Appendices36
4.1. Town Documents Related to Land Development36
4.1.1. Comprehensive Plan36
4.1.2. Regulations and Guidelines37
4.1.3. Brochures, Examples, and Miscellaneous Agreements/Petitions38
4.2. Contacts38
4.2.1. Town of Morrisville Contacts38
A. Planning Department38
B. Engineering Department38
C. Engineering Department – Stormwater38
D. Inspections Department38
E. Fire Department38
F. Parks, Recreation, and Cultural Resources Department38
G. Public Works38
4.2.2 Outside Agency Contacts38
H. Duke Energy Progress38
I. PSNC Energy [Natural Gas]38
J. State of North Carolina39
1. Emergency Management – Flood Maps and Determinations39
2. Division of Energy, Mineral and Land Resources39
3. Department of Transportation39
4. Division of Water Resources – Riparian Buffers; 401 Certificates39
K. Town of Cary39
L. Wake County39
M. Raleigh-Durham International Airport40
4.3 Plant Lists40
4.3.1 General40
A. Plant Characteristics + Conditions Definitions40
B. Plant Characteristics + Conditions Key40
4.3.2 Required Species Diversity40
4.3.3 Recommended Trees and Shrubs41
4.3.4 Non-Woody Plant Material62
4.3.5 Prohibited Plants63
A. Plant List Sources64
4.4 Applications, Permits, and forms65
4.4.1 Development Application65
4.4.2 Annexation Petition65
4.4.3 Assessment Inquiry Request Form65
4.4.4 Food Truck Permit Request Form65
4.4.5 Home Occupation Permit Request Form65
4.4.6 Performance Guarantee Release/Reduction Request Form65
4.4.7 Sign Permit Application65
4.4.8 Special Event Permit Request Form65
4.4.9 Street Vendor Permit Request Form66
4.4.10 Stockpiling Permit Application66
4.4.11 Telecommunication Application66
4.4.12 Zoning Compliance Letter Request Form66
4.5 Checklists67
4.5.1 Site Plan Approval67
4.5.2 Concurrent Construction and Site Plan Approval78
4.5.3 Preliminary Subdivision Plat Approval (Type 1 or Type 2)89
4.5.4 Construction Plan Approval for a Type 1 or 2 Preliminary Subdivision Plat97
4.5.5 Construction Plan Approval for Infrastructure Projects106
4.5.6 Administrative Adjustment111
4.5.7 Administrative Appeal111
4.5.8 Alternative Equivalent Compliance112
4.5.9 Alternative Standards (EDCM)113
4.5.10 Bulletin Drawing113
4.5.11 Comprehensive Plan Amendment114
4.5.12 Annexation114
4.5.13 Conceptual Master Plan Approval115
4.5.14 Development Agreement116
4.5.15 Final Plat116
4.5.16 Food Truck Permit119
4.5.17 Floodplain Development Permit119
4.5.18 Interpretation119
4.5.19 Plot Plan120
4.5.20 Retaining Wall121
4.5.21 Riparian Buffer Development Review121
4.5.22 Riparian Buffer Variance122
4.5.23 Structures in the Right-of-Way Encroachment Agreement123
4.5.24 Rezoning123
4.5.25 Sign Permit123
4.5.26 Site-Specific Development Plan Designation126
4.5.27 Special Event Permit126
4.5.28 Special Use Permit127
4.5.29 Stormwater Variance129
4.5.30 Street Vendor130
4.5.31 Telecommunications Facility Collocation/Modification130
4.5.32 Telecommunications Facility New Tower131
4.5.33 Variance Submittal138
4.6 Fee Schedules140
4.6.1 Application and Inspections Fee Schedule140
4.7 Certifications and Approval Blocks140
4.7.1 Acceptance of Public Dedication140
4.7.2 Certificate of Approval of the Design and Installation of Streets, Public Utilities, and Other Required Improvements140
4.7.3 Certificate of Approval for Recording140
4.7.4 Review Officer Certification141
4.7.5 Tree Preservation Certificate141
4.7.6 Certificates of Ownership142
4.7.6.1 Subdivision Plat142
4.7.6.2 Exempt Plats143
4.7.7 Cross Access Agreement143
4.7.8 Exempt Plat Certification144
4.7.9 Review Officer Certification Surveyor’s Certificate and Seal Certifying the Following144
4.7.10 Town of Cary144
4.8 Final Plat Standard Easement Blocks145
4.8.1 Conservation Easement145
4.8.2 Entry Monument/Signage and Landscape Easement145
4.8.3 Private Access Easement145
4.8.4 Private Open Space145
4.8.5 Private Retaining Wall Easement145
4.8.6 Public Access Easement145
4.8.7 Public Greenway Easement146
4.8.8 Public Sidewalk Easement146
4.8.9 Public Utility Easement146
4.8.10 Sight Triangle Easement146
4.8.11 Storm Drainage Easements146
4.8.11.1 Private Storm Drainage Easement146
4.8.11.2 Public Storm Drainage Easement146
4.8.12 Stormwater Control Measure and Access Easement147
4.9 Review Schedules148
4.9.1 Planning and Zoning Board Quasi-Judicial Decision Review Schedule148
4.9.2 Staff Decision Review Timeframes149
4.9.3 Town Council Decision Review Schedules150
A. Administrative Review Schedules150
4.9.3.1.1 Type 1 Subdivision Preliminary Plat150
4.9.3.1.2 Site Specific Development Plan Designation151
4.9.3.1.3 Right-of-Way Encroachment Agreement152
B. Legislative Review Schedules153
4.9.3.1.4 Comprehensive Plan Amendment and General Rezoning153
4.9.3.1.5 Conceptual Master Plan and Planned Development Rezoning154
4.9.3.1.6 Conditional Rezoning155
C. Quasi-Judicial Review Schedules156
4.9.3.1.7 Special Use Permit and Alternative Equivalent Compliance Review Schedule156
4.10 TRANSPORTATION IMPACT ANALYSIS157
4.10.1 CONTENT OF THE ANALYSIS157
B. Site Location, Access, and Background Information157
C. Existing Analysis157
D. Future No-Build Analysis157
E. Trip Generation158
F. Trip Distribution and Assignment158
G. Future Build Analysis158
H. Future Build Improved Analysis158
I. Supplemental Analysis158
J. Summary of Findings and Identified Improvements158
K. Appendices158
4.10.2 Analysis Standards159
A. Analysis Period159
B. Annual Growth Rate159
B. Analysis Software159
C. Analysis Study Area Boundary159
D. Analysis Scenarios161
E. Traffic Counts161
F. Trip Generation Standards161
1. Internal Capture161
2. Pass-by Trips162
G. Signal Analysis162
H. Modifications to Analysis Standards163

Made with FlippingBook Digital Proposal Maker