Comprehensive Transportation Plan - March 2019
PROJECT SHEETS
International Drive Extension
2010 – n/a New Location
Length 0.18 miles
Project Extents
From: Morrisville East Connector (proposed) To: Southport Drive Traffic Volume (vpd) Street Hierarchy
2010 – N/A 2040 – N/A
Collector Street
Planning Cost Estimate July 2017
Congestion (v/c ratio)
2010 – N/A 2040 – N/A
$1,660,000 Crash Summary (June 2013 to May 2016) N/A
CROSS-SECTION
KEY STANDARD DIMENSIONS
ALTERNATIVE DIMENSIONS
NOTES:
14-ft lanes with sharrows
11-ft to 14-ft lanes
12-ft two way left turn lane
11-ft to 12-ft two way left turn lane
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians.
5-ft minimum verge
0-ft to 10-ft verge
N/A
10-ft sidepath(s)
5-ft sidewalks
5-ft to 8-ft sidewalks
C-7 | PAGE