DRAFT Comprehensive Transportation Plan Update: 2/23/2018 version
PROJECT SHEETS
NC 54 (Chapel Hill Road)
2010 – n/a Widening
Length 2.39 miles
Project Extents
From: Weston Parkway To: Perimeter Park Drive Traffic Volume (vpd) Street Hierarchy Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate 2010 – 19,737 2040 – 32,783
2010 – 1.05 2040 – 0.88
$30,519,000 Crash Summary (June 2013 to May 2016) Total Crashes – 51 EPDO Score – 489.4
CROSS-SECTION
KEY INTERIM BUILD DIMENSIONS
FULL BUILD-OUT DIMENSIONS NOTES:
12-ft inside lane 15-ft wide outside lane
2 11-ft inside lanes 1 12-ft dedicated bus lane
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. For speeds below 35 MPH, sharrows shall be provided in the wide outside lanes. The provision of a wide median is intended to reduce future construction costs along corridors that may need widening to 6-lanes to accommodate dedicated bus lanes.
31.5-ft planted median
17.5-ft planted median
5-ft minimum verge
0-ft to 10-ft verge
10-ft sidepath east side of roadway
10-ft sidepath
5-ft sidewalk
5-ft sidewalk
N/A
N/A
C-11 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8
Made with FlippingBook HTML5