DRAFT Comprehensive Transportation Plan Update: 2/23/2018 version
PROJECT SHEETS
NC 54 (Chapel Hill Road)
2010 – n/a Widening
Length 0.62 miles
Project Extents
From: NW Cary Parkway To: Weston Parkway Traffic Volume (vpd) Street Hierarchy Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate 2010 – 22,412 2040 – 36,398
2010 – 0.96 2040 – 0.82
$7,822,000 Crash Summary (June 2013 to May 2016) Total Crashes – 28 EPDO Score – 193.2
CROSS-SECTION
KEY STANDARD DIMENSIONS
NOTES:
11-ft inside lanes
12-ft dedicated bus lanes
Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. Bus lanes can be center-running or in the outside lanes as shown in the cross-section.
17.5-ft planted median
0-ft to 10-ft verge 10-ft sidepath east side of roadway 5-ft sidewalk
C-12 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8