DRAFT Comprehensive Transportation Plan Update: 2/23/2018 version
INTRODUCTION
THE PLANNING PROCESS
WHAT IS A COMPREHENSIVE
The Town of Morrisville Comprehensive Transportation Plan Update represents a collaborative
TRANSPORTATION PLAN?
effort to establish a vision for the Town’s transportation network and identify a coordinated set of
A Comprehensive
multimodal projects to achieve it. The plan addresses existing issues and anticipated concerns for
Transportation Plan, or CTP,
congestion, safety, access, and connectivity for all modes of transportation. The process began with an
serves as a roadmap to guide
explanation of socioeconomic conditions, a review of plans and policies, and an assessment of the current
multiple modes of
transportation network. A set of guiding statements were developed ahead of creating a coordinated set
transportation development in
of multimodal recommendations. Once the full set of recommendations were developed, a prioritization
Morrisville.
process was created as a tool to help guide decision makers as they advocate for future funding. The
Town of Morrisville Comprehensive Transportation Plan Update serves as the Town’s
WHAT WILL BE EXAMINED?
transportation vision, characterizes current and future transportation needs, and documents multi-modal
This effort will examine the
transportation strategies to address needs through the year 2040. The graphic below outlines the planning
many changes that have
process for the Town of Morrisville Comprehensive Transportation Plan Update .
occurred in the Town’s
Figure 1-1: Planning Process
population, employment, land
use and development since the
adoption of the 2009
Transportation Plan. It will
focus on all modes of
transportation including
roadway, bicycle, pedestrian,
and transit.
WHY IS AN UPDATE NEEDED?
The last CTP was adopted in
2009 and much has changed in
Morrisville since that time.
There have been shifts in
population and employment,
new developments built, and
some changes to
transportation policies. In
addition, many transportation
improvements identified in the
previous plan have already
been advanced to funding and
implementation.