PROJECT SHEETS

Airport Boulevard

2010 – n/a

Access Management

Length 0.25 miles

Project Extents

From: Slater Road To: Factory Shops Road Traffic Volume (vpd) Street Hierarchy Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate 2010 – 26,972 2040 – 41,374

2010 – 0.69 2040 – 1.06

$712,500 Crash Summary (June 2013 to May 2016) Total Crashes – 15 EPDO Score – 126

CROSS-SECTION

KEY INTERIM BUILD DIMENSIONS

FULL BUILD-OUT DIMENSIONS NOTES:

12-ft inside lane 15-ft wide outside lane

2 11-ft inside lanes 1 12-ft dedicated bus lane

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. For speeds below 35 MPH, sharrows shall be provided in the wide outside lanes. The provision of a wide median is intended to reduce future construction costs along corridors that may need widening to 6-lanes to accommodate dedicated bus lanes.

31.5-ft planted median

17.5-ft planted median

5-ft minimum verge

0-ft to 10-ft verge

10-ft sidepath south side of roadway

10-ft sidepath

5-ft sidewalk

5-ft sidewalk

N/A

N/A

C-4 | P A G E D R A F T | 0 2 / 2 3 / 2 0 1 8