Airport Boulevard Extension

2010 – n/a New Location and Grade Separation

Length 0.77 miles

Project Extents

Phase 1: Church Street to Garden Square Lane Phase 2: NC 54 to Church Street

Traffic Volume (vpd) Street Hierarchy 2010 – N/A 2040 – 28,971 Major Thoroughfare Congestion (v/c ratio) Planning Cost Estimate

2010 – N/A 2040 – 0.63

Phase 1: $5,525,520 Phase 2: $25,383,000 Crash Summary (June 2013 to May 2016) N/A

CROSS-SECTION

KEY INTERIM BUILD DIMENSIONS

FULL BUILD-OUT DIMENSIONS NOTES:

12-ft inside lane 15-ft wide outside lane

2 11-ft inside lanes 1 12-ft dedicated bus lane

Town staff can consider alternative dimensions and alternative accommodations for bicycles and pedestrians. For speeds below 35 MPH, sharrows shall be provided in the wide outside lanes. The provision of a wide median is intended to reduce future construction costs along corridors that may need widening to 6-lanes to accommodate dedicated bus lanes.

31.5-ft planted median

17.5-ft planted median

5-ft minimum verge

0-ft to 10-ft verge

10-ft sidepath south side of roadway

10-ft sidepath

5-ft sidewalk

5-ft sidewalk

N/A

N/A