Draft Comprehensive Transportation Plan Update_September 25
PROJECT SHEETS
Airport Boulevard Extension
New Location and Grade Separation
Project Extents Phase 1: Church Street to Current Terminus in Cary Phase 2: NC 54 to Church Street
Length 0.77 Miles
Traffic Volume (vpd) 2010 – n/a 2040 – 28,971 Congestion (v/c ratio)
Street Hierarchy Major Thoroughfare Planning Cost Estimate Phase 1: $5,525,520 Phase 2:$25,383,000
2010 – n/a 2040 – 0.63
CROSS-SECTION
B-1 | P A G E
September 25, 2017 Draft
Made with FlippingBook HTML5