Draft Comprehensive Transportation Plan Update_September 25
PROJECT SHEETS
McCrimmon Parkway
Widening
Street Hierarchy Major Thoroughfare Planning Cost Estimate $ 4,916,000 Project Extents From: Louis Stephens Drive To: Davis Drive Crash Summary (3 year totals) Total Crashes 3 EPDO Score 10.4
Length 0.38 Miles
Traffic Volume (vpd) 2010 – 5,979 2040 – 14,930 Congestion (v/c ratio) 2010 – 0.25 2040 – 0.46
CROSS-SECTION
B-2 | P A G E
September 25, 2017 Draft