FY2021 Budget
FUTURE PROJECT CONCEPT SUMMARIES The recommended FY2021 CIP has been updated to account for rising development cost and other influences such as adopted plan priorities, study results and changing needs. The CIP Project Profiles are conceputal in nature. As a project is activated by a capital budget, project scopes ,cost estimates and appropriations of funding become more finite.
BICYCLE & PEDISTRAIN CONCEPTS
CIP Project:
Crabtree Hatcher Creek Greenway Loop
Project Category:
Bicycle & Pedestrian
Site:
FromMorrisville Parkway to the end of Crabtree Crossing Parkway where Crabtree Hatcher Creek Greenway starts.
Improve greenway connectivity from the Crabtree Hatcher Creek Greenway by extending a multi-use path approximately 0.50 miles along Crabtree Crossing from Morrisville Parkway to current greenway end, within existing ROW.
Description:
Picture/Map:
Serves the interest of mobility and connectivity. The updated CTP indicates the need for a sidewalk on both sides of the road to be in compliance. A sidewalk segment exists currently on the southwest side of the roadway. This project could also be considered a sidewalk gap project rather than a greenway connection. This project will improve connectivity and promote non-vehicular transportation as an extension from the Crabtree Hatcher Creek Greenway. The recent needs assessment survey indicated the top two desired amenities were walking trails and linked greenways and is included in the Parks & Greenways Master Plan. Project could possibly qualify for grant funding through CAMPO or other transportation related options.
Justification:
Other Considerations:
Preliminary Estimate
$
693,000
Includes: ROW, Design and Construction
All projects include in estimate a 25% contingency based on construction cost.
Strategic Goal:
Improved Transportation Mobility