Morrisville Public Transportation Study
Service & Financial Plan
Table 12 | Performance Standards for CFAP Operating Projects: Passengers per Revenue Vehicle Hour
Wake Transit Plan Weekday Standard
CAFP Standard
CFAP Minimum Standard
Passengers Per Revenue Vehicle Hour
1.5 Pax/RVH
1.5 Pax/RVH
Operating Cost Per Passenger Trip
$30.00
$30.00
On-Time Performance
+/- 20 minutes
N/A
Rider Satisfaction
90%
N/A
In addition to the required productivity measures, Morrisville should also measure the average weekday, Saturday, and Sunday boardings by node to determine if nodes should be upgraded to advanced nodes or discontinued in the event of very low ridership. Remediation For each of the measures there should be a remediation policy for over and under-performing service (Table 13). Table 13 | Recommended Performance Remediation
Over-Performing Measure
Over-Performing Remediation
Under-Performing Measure
Under-Performing Remediation Increase marketing Add nodes Expand service Convert to fixed route
Expand service Convert to fixed route Reduce service Revise contract
Passengers per Vehicle Revenue Hour
<1.5 Pax/RVH
>6 Pax/RVH
Operating Cost per Passenger
<$30.00
>$17.00
Expand service Reduce nodes
No change
Average wait times
<30 minutes
>30 minutes
Upgrade to
Average daily boardings by node
Discontinue node
>25
<5
advanced node
Morrisville Public Transportation Study | 77
Made with FlippingBook - Online Brochure Maker