Morrisville UDO Administrative Manual - July 2016

Part 4 Appendices 4.5 Checklists

New Telecommunication Facility Construction Plan Approval for a Site Plan (Major or Minor) Submittal Checklist For each listed item, check (√) if provided, write “n/a” if the feature does not exist or is not proposed, and write “w” if a waiver from the requirement is justified because it is unnecessary in the particular case to determine compliance with applicable regulations. Staff Use Only √, n/a, or w Application Submittal Requirement √, n/a, or w

Surface Area of BMP (sf) (per BMP Manual requirements) Land use Areas (sf) (Impervious, Open Space, Woodlands, etc.) Design Storm Flows (Q 1 , Q 2 , Q 10 , Q 25 & Q 100 ) Design Storm Water Surface Elevations Free Board Other pertinent BMP specific parameters Table of maximum allowable impervious area proposed for each lot/outparcel Plan-Drainage structure ID, rim/grate, inlet and outlet inverts, pipe diameter, material and slope One (1) foot contour lines Spot elevations along accessible routes, ramps, parking stalls, building entrances, corners, curb/pavement corners and grade changes, high points, tie-in points, swales, etc. Location of all existing and proposed utilities (screened), and blow-up of utility conflicts All existing and proposed easements FEMA 100-year floodplain and floodway boundaries including FIRM number Surface waters (show & label top of bank) & wetlands Location, width, and type of each riparian buffer encroaching within the site measured from the top of the stream bank Show all building roof leaders G Soil Erosion Control Plan - see Wake County Environmental Services for requirements H Tree Survey (See Section 5.4.3, Tree Survey, of UDO) 1 Property lines per the Existing Survey Sheet 2 The latest available aerial photograph of the development site 3 Stands of trees, include the location, area, predominant species, general health, estimated tree number, and average DBH 4 Specimen trees, show the location, species, general health, and DBH 5 Dead or diseased trees, where practical 6 The percentage of the development site area covered by existing tree canopy (excluding all proposed street rights-of-way, existing utility easements, and natural water surface areas) 7 All potential retention areas (1, 2,3) See Section 5.4.4, Tree Canopy Retention, of UDO I Tree Protection Plan 1 Property lines per the Existing Survey Sheet 2 The proposed percentage of existing tree canopy to be retained 3 Tree protection areas (must comply with Section 5.4.4, Tree Canopy Retention, of UDO) 4 Location of intersection sight distance areas for all road and driveway intersections (See EDCM for requirements) 5 Location, width, and type of all utility easements 6 Location of all buildings 7 Location of surface vehicle parking 8 Location of roadways and driveways and associated rights-of-way or easements 9 Location of sidewalk(s) and greenway(s) and associated easements 10 Location of grading limits 11 Boundaries of common open space and public recreation areas, including percentage of the development site 12 Boundaries of tree protection area(s) including drip lines of trees near the fencing proposed to be protected 13 Location and details of protective fencing, marking, and signage (See Section 5.4.6.B, Protective Fencing and Signage, of UDO.) J Landscape Plan 1 Property lines per the Existing Survey Sheet 4 Grading/Drainage plans

Morrisville, NC

July 1, 2016 Page 4-81

Administrative Manual

Made with FlippingBook flipbook maker